01
Sample boards first
Specialist finishes cannot be corrected once applied. Boards are made and approved before anything reaches a wall.
Grand period homes and contemporary architect-designed houses. Specialist finishes, and a standard where the finish is the point.
Toorak
Toorak work divides between substantial period houses and contemporary architect-designed builds, and in both the finish is usually specified rather than assumed. We are frequently working to an interior designer or architect rather than directly to a colour the owner picked.
That changes how the job runs. Sample boards get made and approved before anything goes on a wall. Specialist finishes — limewash, Venetian plaster, and two-pack spray on joinery — are not products you can correct after the fact, so the approval happens first and the application happens once. Limewash in particular is unforgiving: it is applied wet on wet and any join that dries before the next pass meets it will show as a permanent lap line.
The other reality is coordination. On a build with cabinetmakers, stonemasons and glaziers still on site, painting is sequenced around everyone else, and the order matters. Joinery sprayed before the stone lands means protecting it for a fortnight; sprayed after, it means masking the stone. Neither is wrong, but it has to be decided rather than discovered.
On these houses
01
Specialist finishes cannot be corrected once applied. Boards are made and approved before anything reaches a wall.
02
Any join that dries before the next pass leaves a permanent lap line. It is applied in continuous runs, or not at all.
03
Spray before the stone arrives or after? Both work. It has to be decided at the start rather than discovered on site.
What we do here
Victorian, Edwardian and Federation homes. Lead-safe preparation, period-appropriate colour, and the slow detail work that stock demands.
Panelling, joinery, specialist finishes and full repaints. Minimum three coats, and the preparation that makes three coats worth applying.
Render, weatherboard, brick and trim, specified for a Melbourne year rather than for a Melbourne week.
Retail, offices and common property. Staged around trading hours and left clean at the end of every shift.
Next step
Send through a few photos and what you have in mind. We will come back within one business day with an honest read on the work, the timing and the range it sits in.